Measuring Time : Improving Project Performance Using Earned Value Management - Vanhoucke, Mario

Measuring Time : Improving Project Performance Using Earned Value Management

Mario Vanhoucke

Yayınevi: Springer

Yayın tarihi: 12/2009

ISBN: 9781441910134

Ciltli | İngilizce | 196 Sayfa | 16x23,62x3,3 cm.

Tür: İşletme-Pazarlama

  • Temin Süresi 49 - 63 iş günü

  • ÜYE GİRİŞİ YAPIN

    temin süresi ve fiyatını size bildirelim

  • ÜYE GİRİŞİ YAPIN

    stoklarımıza girdiğinde bilgilendirelim

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project's time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.

İlgili Ürünler

Bu Türde Çok Satanlar

Kredi Kartına Taksit İmkanı
  • 3 Taksit

  • 3 Taksit

  • 3 Taksit

©1996-2019 Pandora Yayın ve Kitap Hizmetleri A.Ş.

Mersis No: 0721-0430-4310-0015

Tasarım : Logo Site Tasarımı