Construction Scheduling with Primavera Project Planner 2E - Feigenbaum, Leslie

Construction Scheduling with Primavera Project Planner 2E

Leslie Feigenbaum

Yayınevi: Prentice Hall

Yayın tarihi: 02/2001

ISBN: 9780130922014

Ciltli | İngilizce | 340 Sayfa |

Tür: İnşaat

Designed to add a practical hands-on perspective to the software reference manuals, this text helps students develop a proficiency in construction planning and a working knowledge of Primavera Project Planner. Complete in coverage, it first addresses the development and manual calculation of the construction schedule, then introduces Primavera Project Planner in detail, and concludes with an exploration of project controls and how Primavera Project Planner can be used as a tool in enhancing decision making. Assumes a basic understanding of how construction projects are estimated, how they are assembled, and a basic understanding of the Windows operating environment.

İlgili Ürünler

Bu Türde Çok Satanlar

Kredi Kartına Taksit İmkanı
  • 3 Taksit

  • 3 Taksit

  • 3 Taksit

  • 6 Taksit

©1996-2018 Pandora Yayın ve Kitap Hizmetleri A.Ş.

Mersis No: 0721-0430-4310-0015

Tasarım : Logo Site Tasarımı